We had to knock out all the concrete floor with a 65 pound jackhammer, and then dig out as much as 24 inches of packed clay. Then we had to lay the pipes and attach all the fittings so that it would hold 10 lbs of air pressure. We got the east room finished and inspected, so we are putting concrete on that half of the house, but the drains are not yet actually attached to the sewer system! That will come later.  We also got the bathroom window replaced.  And Luke and Krista came to visit in early June.  Although this much work was done by June 1, we did not get the first inspection done until early July. It took a while to get rid of all the leaks!DSCN4650 DSCN4651 DSCN4652 DSCN4653 DSCN4679 DSCN4680 DSCN4682 DSCN4684