This is where I’m going to keep a record, with pictures, of our project on the hilltop. So, some pictures from yesterday.
The pictures loaded in a different order than I wanted them, so the first ones show the wood stoves, the next ones the empty trailer, the shed after we closed the door and the view from the front window just before we left. And the last ones show the diggers hotline markings. The blue are the private water line and the red are the BTES electric line.
On Saturday, 2/3, We brought in the wood stoves from the trailer, with some difficulty. We used both the winch and the yellow strap with the ratchet, then the four-wheeled dolly and the two wheeled dolly and a lot of effort and got them out and where we wanted them. It was a huge victory, in that we did it without getting hurt or wrecking anything!
We also put up the mailbox, but I don’t have a picture of that completed project. The mail lady happened by while we were there, so we had a nice chat with her. And, while Don was working on the mailbox, I cleared a lot more brush from the east side of the house and made the burning pile that much bigger.
I also took another, slightly better, video of the interior before we do any work on it. It can be found at https://youtu.be/ksE5nxbCkJE
Work previously done has included meeting with the men who will be taking care of the raccoon problem – removing all the waste product and the raccoons and blocking the areas they gain entry, taking the shelves down in the area where the kitchen will go and bringing various tools and supplies out to the project.
Recent Comments